- Performance: For large projects, loading times may increase; consider optimizing data retrieval.
- Validation: Add checks to ensure required fields are filled before saving.
- Features: Add options for printing reports, attaching files, or visualizing schedules (e.g., Gantt charts).
- Error Messages: Improve feedback for issues like database errors or invalid inputs.